Insight Terminal Solutions OBOT Held Up By City Of Oakland

Insight Terminal Solutions OBOT Held Up By City Of Oakland.

The Oakland Bulk and Oversized Terminal project has not got off the ground, so to speak, because of stall tactics by the City of Oakland.

The City of Oakland, in its proprietary capacity (as landlord), has failed to provide required documents and review ITS construction drawings as required under the ground lease.

The City of Oakland in its regulatory capacity, refused to engage in a process with ITS to obtain building permits.

Insight Terminal Solutions has a contractual relationship with Phil Tagami and California Capital Investment Group.

Stay tuned.
via IFTTT
https://youtu.be/v79hXox53cw

By Zennie Abraham

Zennie Abraham | Zennie Abraham or "Zennie62" is the founder of Zennie62Media which consists of zennie62blog.com and a multimedia blog news aggregator and video network, and 78-blog network, with social media and content development services and consulting. Zennie is a pioneer video blogger, YouTube Partner, social media practitioner, game developer, and pundit. Note: news aggregator content does not reflect the personal views of Mr. Abraham.

Leave a Reply

Your email address will not be published. Required fields are marked *